Regulatory Report Centre
Due reports, auto-filled drafts, submission log • CBG quality, PCB, SATAT, CFA
Due This Month
8
● 3 overdue
Drafts Ready
6
▲ Auto-filled
Submitted (MTD)
12
● On track
Compliance Score
94%
▲ 2% vs last month
Reports Due (Next 30 Days)
| Report | Authority | Frequency | Due Date | Status | Data Source | Actions |
|---|---|---|---|---|---|---|
| PESO Licence Renewal Application Gas Holder & Compressor licences |
PESO | 5 Years | 04 Jan 2025 | OVERDUE PREP | Auto | |
| Monthly PCB Return (Form V) Air & Water emissions, waste |
MPCB | Monthly | 15 Dec 2024 | Draft Ready | Auto | |
| SATAT Offtake Report (Nov) Dispatch & quality to OMCs |
SATAT | Monthly | 10 Dec 2024 | Draft Ready | Auto | |
| CFA Subsidy Claim — Phase 2 Construction evidence + commissioning |
MNRE/CFA | Milestone | 30 Nov 2024 | In Progress | Semi-Auto | |
| Annual PCB Return (Form IV) Annual environmental statement |
MPCB | Annual | 30 Sep 2025 | Not Started | Auto | |
| Groundwater Abstraction Return CGWA NOC compliance |
CGWA | Quarterly | 15 Jan 2025 | Not Started | Auto | |
| Factory Licence Annual Return Form 22 under Factories Act |
Factory Insp. | Annual | 15 Feb 2025 | Not Started | Semi-Auto | |
| Hazardous Waste Annual Return Form 4 under HWM Rules |
MPCB | Annual | 30 Jun 2025 | Not Started | Auto | |
| OMC Quality Certificate (Batch) Per-dispatch IS 16087 cert |
OMC / SATAT | Per Dispatch | Ongoing | Auto-Generated | Auto | |
| BRSR Report (FY 2024-25) SEBI BRSR Core indicators |
SEBI | Annual | 30 May 2025 | Not Started | Auto |
Auto-Filled Draft Preview
Monthly PCB Return (Form V) — Nov 2024
Maharashtra Pollution Control Board — Monthly Return (Form V)
Period: November 2024 | Unit: Garuda Greens CBG Plant 1 | Consent No: MPCB/RO-PUNE/CONSENT/2024-4521
Period: November 2024 | Unit: Garuda Greens CBG Plant 1 | Consent No: MPCB/RO-PUNE/CONSENT/2024-4521
1. Production Details
| Product | Unit | Quantity (Month) | Consented Capacity |
|---|---|---|---|
| Compressed Biogas (CBG) | kg | 356,400 | 500,000 kg/month | Digestate (FOM/LFOM) | tonnes | 1,240 | 1,500 tonnes/month |
2. Air Emissions (Stack Monitoring)
| Stack | Parameter | Limit | Actual (Nov) | Status |
|---|---|---|---|---|
| DG Set 1 (500 kVA) | PM (mg/Nm³) | 75 | 42 | Compliant |
| DG Set 1 | SO₂ (kg/day) | 12.5 | 3.2 | Compliant |
| DG Set 1 | NOₓ (mg/Nm³) | 710 | 285 | Compliant |
| Flare Stack | Combustion Efficiency | >98% | 99.2% | Compliant |
3. Water Consumption & Effluent
| Parameter | Unit | Month Total | Limit | Status |
|---|---|---|---|---|
| Fresh Water Consumption | m³ | 8,420 | 12,000 | Within Limit |
| Effluent Generated | m³ | 6,180 | — | — |
| ETP Treated & Recycled | m³ | 5,380 (87%) | >85% | Compliant |
| Treated Effluent pH | — | 7.2 (avg) | 6.5–8.5 | Compliant |
| Treated Effluent COD | mg/L | 85 | 250 | Compliant |
| Treated Effluent BOD | mg/L | 18 | 30 | Compliant |
4. Hazardous Waste Generation
| Waste Category | Unit | Generated | Disposed | In Storage |
|---|---|---|---|---|
| Used Oil (5.1) | L | 420 | 400 | 20 |
| Oil-soaked Cotton (5.2) | kg | 85 | 80 | 5 |
| Discarded Containers (33.1) | Nos | 12 | 10 | 2 |
| ETP Sludge (35.3) | kg | 2,400 | 2,400 | 0 |
5. Non-Compliance / Exceedances
6. Data Source Attribution (Auto-Filled)
- Air emissions: Stack monitoring reports (3rd party lab, dated 12 Nov 2024)
- Water/Effluent: ETP online analysers (continuous) + lab validation (weekly)
- Hazardous waste: Waste register (auto-updated from disposal manifests)
- Production: Gas flow meters (MTR-DSP-01) + Weighbridge (WB-01)
Submission Log (Last 30 Days)
| Report | Authority | Submitted Date | Mode | Ack. Ref | Status |
|---|---|---|---|---|---|
| Monthly PCB Return (Form V) — Oct 2024 | MPCB | 14 Nov 2024 | Online Portal | MPCB-2024-11-04521 | Acknowledged |
| SATAT Offtake Report — Oct 2024 | SATAT | 09 Nov 2024 | Email + Portal | SATAT-OCT-2024-087 | Accepted |
| CFA Subsidy Claim — Phase 1 | MNRE | 05 Nov 2024 | CFA Portal | CFA-2024-PH1-0341 | Under Review |
| Groundwater Abstraction — Q2 FY25 | CGWA | 14 Oct 2024 | Online Portal | CGWA-Q2-2024-11234 | Acknowledged |
| OMC Quality Certificates (Batch) | IOCL / BPCL / HPCL | Daily (Auto) | API / Email | Auto-generated | Delivered |
| PESO Half-Yearly Return | PESO | 30 Sep 2024 | PESO-HY-2024-089 | Accepted |
Report Templates & Data Mapping
Auto-Filled Reports (Green = Fully Automated):
- Monthly PCB Return (Form V) — Stack emissions, ETP data, production, waste from sensors & lab
- SATAT/OMC Monthly Offtake — Dispatch records, quality certificates, invoices
- Groundwater Abstraction Return — Flow meter totals (MTR-WTR-01, MTR-WTR-02)
- Hazardous Waste Returns (Form 4/10) — Waste register, disposal manifests
- BRSR Indicators (Greenleaf) — Energy, emissions, water, waste, people, safety
- Carbon MRV Monitoring Report — All meter data with evidence hashes
Semi-Automated Reports (Amber = Partial Manual Input):
- CFA Subsidy Claims — Construction evidence from AeroBuild + commissioning data + bank certs
- Factory Licence Returns — Production auto; worker stats from HRMS; safety from PPE module
- Annual Environmental Statement (Form IV) — Aggregated monthly data + narrative
Key Data Sources (Single Source of Truth):
Gas Flow Meters → Production, CBG sales, Carbon MRV, SATAT
Gas Analysers → PCB Air, SATAT Quality, Carbon MRV (slip), BRSR
Energy Meters → PCB Energy, Carbon MRV (Scope 2), BRSR, Cost/kg
Weighbridge → Feedstock tonnes, Baseline waste, CFA, BRSR Value Chain
ETP Analysers → PCB Water, BRSR Water, Groundwater Return
PPE/CCTV Events → BRSR Safety, Factory Returns, Internal Reports
HRMS/Attendance → Factory Returns, BRSR People, BRSR Training
AeroBuild Handover → CFA Claims, Asset Register, Commissioning Docs